Free shipping in the Northeast & Mid-Atlantic3-Year Craftsmanship WarrantyCall or text (888) 474-9876

Free shipping in the Northeast & Mid-Atlantic

Resources

How to Assemble Your ohubo — An Honest Guide

Questions? Ask our Buyer's Guide, or call or text (888) 474-9876.

No construction experience? You don't need it. Every part is precision-milled to go together like a large, tight-fitting puzzle, and the manual shows every step in pictures. Here's what's involved, how long it takes, and the one mistake to avoid.

What Arrives

Pre-cut parts on one to four packs, and an illustrated manual printed in the box. Everything sorts into a handful of simple groups — floor boards, wall logs (wall panels on the Mira), roof boards, roof beams, factory-assembled doors and windows, storm braces, roof-edge trim, window and door trims, baseboards, spare boards (a floor board, a roof board and one or two wall boards, depending on the model), and the fixings pack. Count it all against the parts list before you schedule your build weekend, and write down the pack number from each pack label. Report anything missing or faulty within 30 days of delivery — your order number and pack number help us sort it fast.

Pre-cut wall logs and boards stacked by type before the build

Before Your Build Weekend

  • A finished, level and square base — check it with a long spirit level, and measure both diagonals: they should match.
  • Anchors to fix the building to your base — bought locally to suit it.
  • A dry forecast for the first couple of days, and tarps on hand just in case.
  • At least two adults and the tools listed below. Keep children and pets away from the work area, and don't build in strong wind, rain or ice, when you're tired, or after drinking alcohol.
  • The parts sorted into groups beside the base, off the ground.
  • Your roof covering bought and ready — and your roof insulation, if you choose to add it — so the roof is closed in right after the roof boards go down. Planning to insulate the floor? Have that insulation ready too — and, on a slab, pavers or a gravel pad, the vapor barrier sheet: both go in as the floor is built (see our Insulation Guide).
  • Your paint or stain bought and ready — we recommend applying it within 24–48 hours of assembly.

How It Goes Together

Prefer to watch? See every step in our assembly video library on YouTube — 19 short videos, in build order.

  1. Unpack and sort. Check every part against the packing list, then sort the parts into groups beside your base — off the ground, and covered if the build runs past a day, so the boards stay straight. The pressure-treated floor joists travel screwed into the base of the pack — don't throw it away. Once the boards are off, unscrew the joists and set them aside: they're the first parts you'll lay.
  2. Floor joists and the starter row. Lay the pressure-treated floor joists across your base, spaced as the manual shows. Where they sit on concrete or masonry — a slab, piers, blocks or pavers — lay a strip of damp-proof membrane under them first; if you'll insulate the floor over a slab, pavers or a gravel pad, lay a full vapor barrier sheet instead. Decide which way the door faces — on many models the layout can be flipped — then set the first row of wall boards: the starter row.
  3. Square it up. Measure corner to corner, both ways across, and nudge the corners until the two measurements match. Get this right, and every row above goes on straight.
    Videos show general assembly principles on a demonstration building. Follow the printed manual for your model.
  4. Anchor it and fix the starter row. Fix the building to its base with anchors you buy to suit it (they're not in the kit) — long outdoor wood screws into a timber base, screws or anchors made for concrete into a slab or piers. On concrete, make a shallow recess for each head so it doesn't get in the way of the floor, then drill through into the concrete with a masonry bit. Then screw the starter boards down. Pre-drill near the board ends so nothing splits.
  5. The walls. Stack the wall boards row by row, leaving the door and window openings empty — the frames go in later. Tap each board home with a rubber mallet over a scrap block of wood — the corners lock together without nails. Between the window and door openings, the wall is built from short boards; the manual shows which go where. Re-check the corner-to-corner measurements every few rows. The top boards finish the walls — depending on the model, one or more of them are longer than the rest; the manual shows which board goes where, and which way up.
    Tapping a wall board down with a rubber mallet and a scrap of wood
    Tap each board home with a rubber mallet and an offcut.
    Log walls half built on the floor platform, with the door and window openings
    Row by row, the walls lock together.
    Videos show general assembly principles on a demonstration building. Follow the printed manual for your model.
  6. Gables and roof beams. Lift the gables into place — depending on the model, they come already assembled, with cut-outs for the roof beams — then set the roof beams from gable to gable, each in the spot the manual shows.
  7. Door frame and windows. Now the frames go in. Screw the outside trims onto the door frame and the windows, set them into their openings from the outside, then screw the inside trims to the wall, keeping the screws well clear of the frame and the glass — the trims hold each frame in place. Never screw a frame to the wall boards, and keep the gap above it: solid wood walls settle a little, and they need room to slide down around the frames.
    Videos show general assembly principles on a demonstration building. Follow the printed manual for your model.
  8. Hang the door. Stand the door on the bottom of the frame, measure the gap at the top, halve it and mark where the top of the door goes. Lift the door to the mark, hold the hinges in place and mark their positions, then drill and screw the hinges into the frame. The hinges don't adjust up or down — only in and out, by screwing them in or out just a little — so take your time with the marks. If you've kept the building square as you built it but the door still doesn't sit quite evenly in its frame, a gentle nudge can help the walls settle into place — that's only possible before the roof boards go on and lock everything in place. Then fit the handle, the lock and the threshold.
    Videos show general assembly principles on a demonstration building. Follow the printed manual for your model.
    Roof beams set between the gables of a garden cabin
  9. Close the roof. Lay the tongue-and-groove roof boards — snug, but not too tight — with an even overhang on both sides, fixed as the manual shows, and trim the last board if it overhangs. Get your roof covering on right away; once it's on, fit the fascia and roof-edge trim.
  10. Floor, baseboards and storm braces. Lay the floorboards across the joists, leaving a small gap at the walls, and screw the baseboards to the wall to cover it. Keep the boards snug, but don't force them tight — dry boards take up moisture and need a little room to move. Over a gravel or paver base, give the underside a coat of your exterior finish before you lay them; you can't reach it once they're down. Finally, fit the storm braces exactly as your manual shows.

Building a Mira? It's panel-built, so its walls go up as panels rather than log by log — its printed manual shows each step.

How Long It Takes (Two Adults, Excluding Foundation and Roofing)

Typical assembly time for each ohubo model
ModelsModel sizeTypical build time
Aria, Luna, Thea≈77–108 sq ft1–2 days
Vela, Mira≈139–153 sq ftAbout 2 days
Neva, Isla≈207–224 sq ft2–3 days
Cove, Vale≈298–348 sq ft3–4 days, spread over two weekends
Kaia, Sara, Orla, Hana, Alva (storage sheds)≈48–111 sq ft1–2 days

Two adults, excluding foundation and roofing. Actual time depends on the size of your crew and their experience.

Good to Know

  • A bowed board? Solid wood can bow a little — it's natural. Line up the tongue and groove, press the bow down and tap it in from one end to the other. If it still lifts, clamp it right at the bow, tap the board into the grooves, then take the clamp off — the rows above will hold it in place.
  • Spare boards. Your kit includes a spare floor board and roof board, plus one or two spare wall boards, depending on the model. They're there in case a board gets damaged, or you'd like a different look — wood is a natural material, so no two boards are quite alike; try turning a board over first. Need a shorter wall board? For a piece notched at one end, cut a regular wall board to length. For a full board for a shorter wall, cut down one of the longer top boards, if your spares include one, and cut a new notch at the cut end. Never cut into the tongue or groove edges.
  • Rain mid-build? A shower won't hurt the timber as long as it can dry out. Cover the open structure with tarps overnight, and keep the sorted parts under cover: loose boards that get wet on one side can bow, while boards already in the wall are held straight by the rows above.
  • Keep the manual open. This guide and the videos show the general method on a demonstration building; your printed manual has the exact order and parts for your model. Build it as designed — leaving parts out or cutting new openings weakens the building, and changes made without our approval aren't covered by the warranty. If a board won't seat, don't force or trim it — check its number against the drawing; it usually belongs in another row or just needs turning around.

Tools You'll Need

Cordless drill/driver with drill bits for pre-drilling (plus a masonry bit if you're anchoring to concrete), hammer, rubber mallet and a scrap block of wood, a long spirit level, tape measure, stepladder, utility knife, hand saw, a clamp or two, work gloves and safety glasses. Nothing specialist. Plug power tools into a GFCI-protected outdoor outlet, and stand the stepladder on firm, level ground.

Tools needed to assemble an ohubo kit

The One Rule People Miss: the Walls Must Float

There's no stud frame — the walls are solid stacked logs, and solid wood moves. Over the first 12–18 months the boards dry and settle; after that they expand and shrink a little with the seasons, for the life of the building. That's why the manual leaves a small gap above the doors, windows and any fixed fittings — so the wall can settle without binding. Follow those gaps, and never screw anything rigidly across the wall boards. It's the single most important thing to get right, and the manual shows you exactly where.

Settling gap above a door frame, left so the log walls can settle

Four More Mistakes to Avoid

  • Building on a base that isn't level — doors stick and the logs won't seat tight.
  • Hitting the boards with a bare hammer — always tap over a scrap block with a rubber mallet.
  • Skipping the anchors and storm braces — they hold the building down in strong wind.
  • Leaving the wood unprotected — we recommend fitting the roof covering and painting or staining the outside within 24–48 hours of assembly.

After the Build: Your First Weeks

  • Right away: the roof covering, if it isn't on yet — see our Roofing Guide.
  • Within 24–48 hours (recommended): paint or stain every outside surface, board ends included. It protects the wood, and damage from leaving it unfinished isn't covered by the warranty — our Paint & Stain Guide walks you through it.
  • After the first season: the walls settle most in their first 12–18 months. Re-check the door: if it starts to rub, turn the hinges in or out a little — it's the one adjustment they have. Keep the gaps above the doors and windows clear, and make sure nothing is screwed across the wall boards — see our Care & Maintenance guide.
A newly built solid-wood garden cabin, not yet painted

Prefer Not to Build It Yourself?

We don't offer installation, but a local handyman or carpenter can assemble your building — of the three jobs (foundation, assembly, roofing), it's the simplest. Services like Thumbtack and Angi make it easy to compare local pros and their reviews: post the job, share this guide and our assembly videos, and compare quotes.

Stuck on your project?

Ask our Buyer's Guide, or call or text us — real people who know every model, happy to talk you through any step.

(888) 474-9876
From kit to cabin
Review us on: