Your Foundation: Choosing the Right Base
Questions? Ask our Buyer's Guide, or call or text (888) 474-9876.
A firm, level base is the single most important part of your build. Set straight on the soil, the wood draws up moisture and starts to rot. Set on an uneven base, the walls go up out of true — doors and windows stick, and the wall logs won't seat tight, leaving gaps. Get the base right, and everything above it lasts for decades.
Do I Need One? Yes — Every Model
Even the smallest model needs a firm, level base: it keeps the timber off the ground, keeps it dry, and keeps the structure square so it goes together properly. Every kit includes pressure-treated foundation beams. Garden houses, cabins and studios also come with the floor, so all you prepare is the ground base beneath it; storage sheds ship without floorboards.
Two Families: On-Grade vs. Permanent
On-grade bases rest on the surface and can be lifted or moved later. Permanent bases are fixed in place. As a rule, on-grade suits most smaller models; permanent suits larger cabins and anything you'll heat and use all year.
On-Grade Options
- Gravel pad — excavated and compacted gravel, with landscape fabric underneath to stop anything growing through. Drains beautifully; best on flat, firm ground; can shift over time on soft or wet soil, so add drainage if water tends to sit.
- Concrete pavers or blocks on gravel — quick, budget-friendly and easy to level in a grid. Best on level ground; in high-wind areas, anchor to larger, heavier blocks.
- Pressure-treated timber frame on gravel — a little more give on slightly uneven ground; galvanized rods through the corners keep the layers from shifting.



Permanent Options
- Concrete slab — the gold standard: solid, permanent, and ideal for a studio or larger cabin used year-round. It's also the base most likely to need a permit. Even if you'd like the bare concrete as your floor, the wall boards still sit on the kit's pressure-treated beams — never straight on the concrete; ask us before you build.
- Concrete piers or ground screws — the answer for sloped or uneven sites. Ground screws need no digging and go in within hours; concrete piers need a hole for each pier but far less concrete than a slab. Both are easier to remove later than a full slab.



Compare Your Options
| Base | DIY effort | Cost | Best for | Watch out for |
|---|---|---|---|---|
| Gravel pad | Moderate — about a weekend for two | $ | Flat or gently sloping, well-drained ground | Needs a solid timber edge and good compaction, or it can shift |
| Pavers or blocks on gravel | Easy | $ | Flat, firm ground | Can settle on soft soil; fewer ways to anchor |
| Timber frame on gravel | Moderate | $–$$ | Slightly uneven ground | Use lumber rated for ground contact, and tie the corners together |
| Concrete piers | Harder — holes dug to frost depth | $$ | Slopes, soft soil, any size | The building sits higher, so plan a step at the door |
| Ground screws | Hours, by a local installer | $$ | Slopes, tree roots, no-dig sites | Ask the installer about screw length for your soil |
| Concrete slab | A job for a pro | $$$ | Larger buildings used year-round | The base most likely to need a permit |
$ = lowest cost, $$$ = highest. Prices vary a lot by region — get a local quote for piers, screws or a slab.
Piers and Slabs: Go Below the Frost Line
In cold regions, frozen ground heaves. Concrete piers and slab footings need to reach below your local frost depth — from a few inches in the South to four feet or more in the far North — and that includes the piers under a deck, veranda or canopy post. Your building department will give you the figure for your address. Keep the tops of the piers a few inches above the ground so the frame stays dry.
Three Rules That Never Change
- Level and square — level within about a quarter inch, and square when the two diagonals measure the same. This is what keeps doors working and the logs locking tight.
- Airflow underneath — the building sits up off the ground so the wood breathes and never stays wet.
- Sized to the footprint — match the exact footprint listed on your model's product page. A veranda, deck or canopy stands on supports of its own, set together with the base — see the note under the size table below.
Foundation Size by Model
| Model | Footprint (foundation size) |
|---|---|
| Aria | 8 ft 2 in × 9 ft 10 in (2.50 × 3.00 m) |
| Luna | 9 ft 9 in × 9 ft 9 in (2.98 × 2.98 m) |
| Thea | 13 ft 1 in × 9 ft 9 in (3.98 × 2.98 m) · with canopy: 13 ft 1 in × 14 ft 5 in (3.98 × 4.39 m) |
| Vela | 13 ft 9 in × 11 ft 9 in (4.18 × 3.58 m) |
| Mira | 18 ft 2 in × 9 ft 3 in (5.54 × 2.82 m) |
| Neva | Cabin 15 ft 3 in × 15 ft 3 in (4.65 × 4.65 m) · with veranda: 15 ft 3 in × 21 ft 10 in (4.65 × 6.65 m) |
| Isla | Cabin 19 ft 3 in × 13 ft 1 in (5.88 × 3.98 m) · with deck: 21 ft 4 in × 15 ft 2 in (6.51 × 4.63 m) |
| Cove | Cabin 17 ft 1 in × 19 ft 4 in (5.20 × 5.90 m) · with deck ≈25 ft 7 in long (≈7.8 m) |
| Vale | Building 19 ft 6 in × 19 ft 6 in (5.95 × 5.95 m) · with canopy: 20 ft 8 in × 26 ft 2 in (6.29 × 7.99 m) |
| Kaia | 7 ft 7 in × 6 ft 8 in (2.30 × 2.02 m) |
| Sara | 9 ft 2 in × 5 ft 11 in (2.80 × 1.80 m) |
| Orla | 9 ft 2 in × 9 ft 2 in (2.80 × 2.80 m) |
| Hana | 9 ft 2 in × 9 ft 2 in (2.80 × 2.80 m) |
| Alva | 12 ft 6 in × 9 ft 2 in (3.80 × 2.80 m) |
For the Thea, Neva, Isla, Cove and Vale, the canopy, veranda or deck reaches past the walls and stands on supports of its own — we'll send you the support layout for your model before you build. Set those supports together with the cabin base, to the same height and of the same type (piers with piers, ground screws with ground screws, blocks on the same compacted gravel), so the floor runs through level and the cabin and deck move together through freeze and thaw. A deck or veranda floor sits level with the cabin floor or slightly below — never higher, because the doors open outward over it. Under the Thea and Vale canopies you add the decking or pavers yourself: keep them at or below the cabin floor and slope them at least 1/8 in per foot away from the cabin. The Vale's canopy rests on two corner posts, each on a footing of its own. Our decks are made to sit close to the ground — if any part would end up more than about 30 in above it, codes call for guards and stairs, so ask us before you build.
Why the Base Matches the Footprint
Build the part that carries the building to the footprint in the table. A base that sticks out past the walls becomes a ledge where rain collects against the bottom boards — so don't extend a slab or timber frame under an open deck, where rain falling through the boards would run back against the walls. A gravel pad can run wider as a drip strip; a path or patio is best built separately, not as part of the base. Under a deck or veranda, clear the turf, lay landscape fabric and gravel, keep the sides open or vented, and leave the airflow gap under the cabin open where the deck meets it. Never screw deck framing, ledger boards or posts into the wall logs — the walls settle over the first 12–18 months — and fit the kit's parts exactly as the manual shows. Any lumber you add should be pressure-treated and rated for ground contact, fixed with hot-dip galvanized or stainless-steel screws and connectors.
How to Build a Gravel Pad
A popular DIY base, especially for smaller models:
- Mark it out with stakes and string — your model's footprint plus about a foot on every side, so roof drips land on gravel, not soil. Choose a spot that drains, not a low spot where rain collects; if water tends to sit there, fix the drainage first or choose piers or ground screws.
- Dig out the turf and topsoil, about 4–6 in deep, and level the bottom.
- Lay landscape fabric so nothing grows through and the gravel doesn't sink into the soil.
- Set a frame of pressure-treated timbers rated for ground contact (4×6s are typical) around the edge — level, square (measure both diagonals — they should match) and staked at the corners. Its top sets the height of the pad: keep it an inch or two above the surrounding ground, so rain runs away from the pad, not into it.
- Fill with crushed gravel in layers, compacting each one with a plate compactor from a rental store (a hand tamper isn't enough), until the pad is firm and level to within about a quarter inch; make the top layer clean ¾-inch stone with no fines (often sold as #57), so rain soaks through. Then run a hose over it — the water should soak straight in; if it puddles, fix the drainage before you build. Your kit's foundation beams rest straight on the compacted gravel (the frame only holds it in place); on gravel, we recommend a plywood or OSB subfloor on the beams, under the floorboards — except on the Isla, whose thicker floor doesn't need one, and the Cove and Vale, whose interior doors only clear the kit's own floor.
Before You Dig — Call 811
Call 811 (or use your state's 811 website) a few business days before you dig, set piers or drive ground screws. It's free, it's required by law, and your local utilities will mark any buried lines in your yard.
Anchoring and Storm Braces
Every ohubo should be fixed down to its base. Fasten the base frame to your foundation with the anchors your base calls for (buy them locally — they're not in the kit) — screws or brackets into a slab or piers, ground screws, or heavier blocks on a paver base. Fix a deck frame to its supports the same way, and stand each canopy post in a metal post base bolted to its footing, so wind can't lift the canopy. The walls settle but posts don't — check a canopy on posts a few times in its first year, and tell us if its outer edge sits higher than the wall side. Then fit the storm braces from your kit exactly as the manual shows; they help hold the walls tight to the base in strong wind. In hurricane-prone or very windy areas, ask your building department what anchoring they require. Wind damage to a building that wasn't anchored and braced isn't covered by the warranty. And whatever base you choose, check your local rules first — a permanent slab is the most likely to need a permit.


Common Questions
- Can I put it straight on the lawn?
- No. Wood on soil stays damp and rots, and turf never stays level. Remove the turf and build one of the bases above — even our smallest model needs one.
- Can I build on my existing patio or deck?
- Possibly. A level concrete patio in good condition can serve as the base for a smaller model if water drains away from it; a wooden deck has to be built to carry the whole building. Have a builder check either one first.
- What about the gap under the floor?
- Keep it — the airflow keeps the underside dry. To keep leaves and critters out, close the sides with fine metal mesh or a vented skirt, never solid boards that trap damp air.
- Do I need a moisture barrier?
- Wherever the wood sits on concrete or masonry — a slab, piers, blocks or pavers — put a strip of damp-proof membrane under the foundation beams: it's cheap insurance against the wood drawing up moisture. If you'll insulate the floor over a slab, pavers or a gravel pad, lay a full vapor barrier sheet instead (see our Insulation Guide). Otherwise, on gravel, the landscape fabric under the stone is all you need.
- How long does the base take?
- A gravel pad or paver base: usually a weekend for two people. Ground screws: a few hours for an installer. Piers and slabs take longer, because the concrete needs time to cure before you build on it.
- Does the base need a permit?
- Sometimes — a slab most often. Ask your building department about the base, the building and any deck, veranda or canopy together — many towns measure setbacks to its outer edge; see our Permit Guide.
Stuck on your project?
Ask our Buyer's Guide, or call or text us — real people who know every model, happy to talk you through any step.